Case Study: TRANSFLO

Case Study: TRANSFLO

calendar icon July 14, 2026

Office and Locker Room
Tampa, FL
1,664 total square feet

The Challenge

Transflo needed to replace an aging modular building that no longer met the demands of its 24-hour operation at the Port of Tampa. The company required expanded locker room space, new shower facilities, enhanced security, and a durable, low- maintenance building capable of withstanding heavy daily foot traffic while providing long-term value.

The Solution

Transflo selected ABS based on responsiveness and hands-on approach for a New 26’x64’ – 1,664 square foot Custom Office and Locker Room building.

ABS delivered a permanent modular office and locker room facility designed for long-term durability, security, and low maintenance in a 24/7 port environment.

The building features commercial-grade 18” x 30” glue-down LVP flooring with 4” cove base, a perimeter frame with steel floor joists, double 5/8” floor decking, galvanized bottom board, and Hi-Rib steel exterior. Interior systems include fiberglass showers, flush-valve fixtures, ERV with dehumidification HVAC system, and full height FRP wall finishes for a cleanable, high-durability interior.

Security and performance upgrades include interior and exterior cipher locks on doors, high-impact resistant windows, aluminum stairs and ramps, white metal awnings, 24” roof overhangs with site-installed gutters and downspouts, and a 15-year roof warranty.

The result is a durable, permanent modular solution built to withstand heavy daily use and continuous operation.

 

 

Download this Case study as a PDF

Take a look at all our completed projects

View interactive map