Modular Building Case Studies

Case Study: TRANSFLO

calendar icon July 14, 2026

Office and Locker Room Tampa, FL 1,664 total square feet The Challenge Transflo needed to replace an aging modular building that no longer met the demands of its 24-hour operation at the Port of Tampa. The company required expanded locker room space, new shower facilities, enhanced security, and a durable, low- maintenance building capable of […]

Learn More

Case Study: CIVIL AIR PATROL

calendar icon December 3, 2025

Classroom Ormond Beach, FL 864 total square feet The Challenge The Civil Air Patrol sought a solution that would create a lasting, positive impact for the Ormond Beach Composite Squadron while also honoring the memory of a respected aviator, educator, and mentor. The organization needed a cost-effective way to expand its capabilities and support the […]

Learn More

Case Study: HIGH POINT CHURCH PROVIDENCE ACADEMY

calendar icon December 3, 2025

Classrooms – Education Lake Wales, FL 10,464 total square feet 14 Modules The Challenge Providence Academy, a private school based at High Point Church experienced rapid enrollment growth and urgently needed additional classroom space. The challenge was to develop a full school campus quickly—without disrupting ongoing instruction. The Solution Providence Academy partnered with Alternative Building […]

Learn More

Case Study: ARCOSA

calendar icon December 3, 2025

Office and Locker Room Old Bridge, NJ 720 total square feet The Challenge ARCOSA had purchased an older building from a competitor, but over a short period of time the structure deteriorated due to poor construction quality. When it came time to replace it, ARCOSA needed a reliable partner who could deliver quickly and stand […]

Learn More

Take a look at all our completed projects

View interactive map